About detail
About UsCurrent position >About Us

Company Profile

How to pass Level 15 of Water Flow?

Level 15 clearance operation process for Water Flow: Step 1: Open the pin on the bottom of the black water and click on the horizontal pin directly below the black water area to start the black water flowing downwards.. Step 2: Open the diagonal pin on the lower right side of the black water and click on the diagonal pin on the lower right side of the black water to guide the black water to flow towards the lower right side and avoid blockage. Step 3: Close the horizontal pin on the lower side and click on the horizontal pin in the middle of the bottom to block the black water from continuing to flow downwards, freeing up space for subsequent operations. Step 4: Open the pin on the lower side of the blue water and click on the horizontal pin directly below the blue water area to start the blue water flowing downwards. Step 5: Open the diagonal pin on the lower side and click on the diagonal pin on the bottom right side to guide the blue water to flow to the right and merge with the subsequent red water. Step 6: Open the plug on the lower side of the blue water again to confirm that the blue water flow path is correct, then click on the plug on the lower side of the blue water again (if it has already been opened, there is no need to repeat the operation) to ensure that the blue water continues to flow. Step 7: Close the left diagonal pin and click on the left diagonal pin to block the black water from flowing back to the left and avoid interfering with the red water flow path. Step 8: Open the pin under the red water and click on the horizontal pin directly below the red water area to make the red water flow downwards and merge with the blue water. Final result: When the "Completed" prompt appears and all three colors of water flow into the target area according to the designed path, the screen displays a clearance prompt. Key logic: By controlling the switch of the plug in stages, priority is given to guiding the diversion of black and blue water, and finally releasing the red water, ensuring that the three water flows do not interfere with each other and ultimately converge into the target container. Attention should be paid to the timing of closing the plug during operation to avoid water backflow or path blockage.

How to pass Level-26 of Water Flow?

The Level-26 clearance steps for Water Flow are as follows, with the goal of collecting one cup each of the red, yellow, and blue solutions: Step 1: Open the initial pin and open the two adjacent pins on the lower left side of the push-pull valve to create a channel for subsequent solution flow.. Step 2: Adjust the position of the push-pull valve and push it to the right to the end, changing the flow path of the solution. Step 3: Collect the red solution and open the plug below the red solution to allow the red solution to flow into the corresponding measuring cup. Step 4: Prepare the yellow solution channel, open the horizontal pin above the yellow measuring cup, and insert the horizontal pin on the left side of the lower end to construct the flow path of the yellow solution. Step 5: Collect the yellow solution and open the pin below the yellow solution. Then, open the horizontal pin on the left side of the lower end again to allow the yellow solution to flow into the measuring cup. Step 6: Prepare the blue solution channel and open the pin above the blue measuring cup to create conditions for the flow of the blue

『SILVER Official Website SERVICE』

Copyright2026SILVER E-Commerce
+86 15365082610